Been getting things done around the house

We have been doing a lot of work around the house lately since the weather has been warmer.

We patched the roof up in certain spots where we had some leaks.

Soon, we plan on putting a whole new tiled roof on the house after we tear off all the shingles. Anyway, we managed to take down a sizable tree in the front yard, which was a real hassle. Seriously, we kept having to take AC breaks in the house while working on taking that behemoth down. It’s a good thing our air conditioning system works so well. It’s actually a ductless mini split AC and so far it has been saving us a lot on the energy bills and has been keeping us super comfortable. So after the tree was taken down, we got a new basketball hoop that we had to put together. That actually was kind of difficult since we kept losing important pieces in the lawn. We even used a metal detector to find one last piece that we were missing and my wife ended up finding it. Now that the basketball hoop is up, we played some games and it was a fun time. But now we have the new swing set for the children that we have to put up. I read that this particular set can take a whole day to put together, so I’m getting ready for that. I know that we will have to have the air conditioning system really cranked up that day because we’re going to be sweating profusely. It’s supposed to be in the 90s the day we plan on working on the new swing set.

 

 

Heating technology